|
Distribution Warehouses and Offices, Leyton Rosemound
One of two simultaneous projects in East London, to provide space for existing occupiers to re-locate to enable the 2012 Olympic site to be developed.
Rosemound were selected because of a...
[click here for case study & download...] |
| |
|
Distribution Warehouses and Offices, Beckton Rosemount
One of two simultaneous projects in East London, to provide space for existing occupiers to re-locate to enable the 2012 Olympic site to be developed.
Rosemound were selected because of a...
[click here for case study & download...] |
| |
|
Distribution Warehouses and Offices, Northamptonshire Rosemound for Argos
This single storey warehouse/production facility of almost 500,000ft2 with a 2 storey office attached was the second unit on the Max Park distribution park, which was masterplanned by the Practice. <...
[click here for case study & download...] |
| |
|
Distribution Warehouses and Offices, Northamptonshire Rosemound
The final phase on this development included 2 buildings with a total area of 450,00ft2. The site had been zoned for B1 use, but we were able to obtain Planning permission for B8 by creating a more...
[click here for case study & download...] |
| |
|
Project Hardcase, Oliver Road West Thurrock
The project comprises one single storey Warehouse unit of approximately 320,000 sq ft with ancillary two storey office accomodation of approximately 13,175 sq ft and a three storey purpose built car...
[click here for case study & download...] |
| |
|
|